Novapoint Online Documentation
You are here: » Novapoint Resource Center » Novapoint Help » Water & Sewer » Release Notes » Updates in Novapoint Water and Sewer
Updates in Novapoint Water and Sewer
Version 18.10FP2c 64 bit
Configuration
- Fixed: WS-config did't remember all settings in predefined pipe/connection matrix. As a result the height of the top cover for the manhole was not copied to the manhole in the created trench.
Construction
- Fixed: When changing Project-ID the previous WS model was still active if some of the drawing functions had failed (memory was not updated).